Our practice covers the full UFC 4-010-01 envelope scope. Facade components (glazing, framing, anchorages) dimensioned to the reference threat level per the Antiterrorism Operational Requirements (OR) of the project. Progressive-collapse verification on envelope-to-structure interfaces, to ensure that local envelope failure does not trigger disproportionate structural damage. Mass-casualty prevention through glazing fragment-retention design, anchor dissipative zones, and debris-trajectory analysis.
UFC 4-010-01 applies to all new DoD inhabited buildings above a threshold, to major renovations, and to host-nation projects where DoD personnel are stationed. On embassy and diplomatic facilities, it interlaces with SECCA and with the receiving nation's own security frameworks.